FACILITY AREA
 

Required area of installation in automated systems: Minimum 5500 m2 (800 m2 for machinery and equipment, drying area 1800 m2, dry ready storage area 1600 m2, aggregate storage area 1000 m2, empty pallet holding area 300 m2) (Calculated with the installed concrete batching plant) The total transformer or generator power required to be installed in automated systems must be 200 kVA. The installed capacity is 125 kw/H. Concrete plant is included. Number of personnel required to operate the factory in automatic systems: 2 people (1 operator and 1 forklift driver).


GENERAL INFORMATION ABOUT THE AREA TO BE ESTABLISHED

NOVAL INC. It recommends to install a minimum 1000 m2 indoor area in order to protect the machine, empty pallet holding and fresh product drying area from bad weather conditions. buyers should be prepared the concrete infrastructure of the area where the factory is established. NOVAL INC. prepare a detailed measurement plan for the area where the infrastructure will be established. The quality of concrete and the loads that it will carry, namely the static calculation and the strength of the reinforced concrete structure, must be carefully calculated and prepared by civil engineers. The electrical installation up to the control panel of the factory belongs to the receiver. It is necessary to have water plant and compressed air compressor and installation to the mixer unit of the factory. In order to start the installation, concrete, aggregate, water installation and water, concrete suitable for the concrete project, pressurized air compressor with a capacity of at least 1000 lt, forklift, bucket, telescopic crane with at least 20 tons lifting capacity, machine with electricity and distributor electrical panel at desired power and operators will be ready to operate the equipment. Personnel assigned by the vendor at the time of installation in accordance with the rules of occupational safety and health (electrical and electrical equipment provided with grounding and isolation, machine and machinery with safe and suitable hand tools, safe scaffolding and platforms, etc.) and work safety equipment (helmet, steel toe cap and soles, non-conductive rubber shoes, suitable for working in high places, etc.) To ready and assembly work done in terms of occupational health and safety concern and also to check and fix as soon as the negativities emerged.